TM 10-3835-219-14
c. Inspect kit chests for broken or bent handles, broken, bent, or loose latches, broken or damaged hinges, and
for dents, breaks or any other distortions.
d. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in ac-
cordance with the instructions of DA PAM 738-750.
e. Check to see whether the equipment has been modified.
4
4 .
Lubrication, Upon receipt of equipment, perform operators lubrication instructions and PMCS.
4-5.
Testing. Perform unit level PMCS and operators Before (B) PMCS before starting fueling operations. Start fuel
operations and observe operation.
Section Ill. UNIT PREVENTIVE MAINTENANCE
Paragraph
4-6
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CHECKS AND SERVICES (PMCS)
Page
. . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4-7
PMCS Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4-2
4-6. General. Unit level maintenance PMCS are done to ensure that the Fuel Handling Hoseline Outfit is in top operat-
ing condition. A comprehensive PMCS program reduce equipment downtime and increases the operational readiness
of the equipment.
4-7.
PMCS Procedures. Unit level PMCS are in Table 4-1. The numbers in the Item No. column show the order in
which the checks or services should be performed. These numbers should be used when recording deficiencies and short-
comings on DA Form 2404, Equipment Inspection and Maintenance Worksheet. The dot () in the interval column indi-
cates when a check or service should be performed.
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS).
W - Weekly
M - Monthly
Q - Quarterly
H - Hourly
Interval
Item to be inspected
Item
w
M
Q
H
Procedure
Equipment is not ready/available if:
1
l
Hose Assembly
Test hose assembly. Refer to
Fails test.
para. 4-12.
4-2 Change 1
|