Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Check Valve Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM     10-3835-219-14 3 - 1 3 .    C h e c k     V a l v e     A s s e m b l y . This   task   covers: Replace INITIAL   SETUP Tools E q u i p m e n t     C o n d i t i on Repair   Kit   (Appendix   C,   Section   11, Pump   shut   down   (refer   to   applicable   TM). item   4   or   9)   as   applicable e   (figure   3-11) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) Apply   hose   clamp   (1)   on   each   side   of   check   valve   (2). Remove   two   bolts   (3)   and   nuts   (4)   securing   lower   half   of   pipe   coupling   clamp   (5)   and   upper   half   of   pipe coupling   clamp   (6)   on   one   side   of   check   valve. Remove   pipe   coupling   clamp   halves   and   gasket   (2). Drain   residual   fuel   into   appropriate   container. Repeat   procedures   2   and   3   for   the   opposite   side   of   check   valve. Install   new   check   valve,   Place   gasket   (7)   over   one   hose   end,   make   certain   gasket   is   flush   with   end. Align   check   valve   and   hose   couplings. When   couplings   are   in   proper   alignment,   slide   gasket   (7)   over   joint   and   center   it   in   place. Position   lower   coupling   clamp   half   (5),   then   position   upper   coupling   clamp   half   (6). Install   two   bolts   (3)   so   that   nuts   (4)   will   be   exposed   on   the   upper   coupling   clamp   half. Hand-tighten   nuts   evenly,   then   using   a   wrench,   tighten   nuts   evenly   until   the   coupling   faces   just   meet. Continue   tightening   nuts   evenly   until   both   bolts   are   secure. Repeat   procedures   6   through   12   for   opposite   side   of   check   valve. Remove   both   hose   clamps   (1). 3 - 1 8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business