Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND FABRICATION PROCEDURES FOR ACCESSORIES is changed as follows
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 10-4500-200-13
C1
CHANGE
HEADQUARTERS
DEPARTMENT OF THE ARMY
NO. 1
WASHINGTON, D.C., 9 NOVEMBER 1992
Technical Bulletin
ASSEMBLY AND FABRICATION PROCEDURES
FOR ACCESSORIES REQUIRED TO ADAPT A
55-GALLON DRUM TO A FUEL SUPPLY TANK
USED WITH HEATER, SPACE, RADIANT TYPE,
PORTABLE, (LIQUID FUEL)
Approved for public release; Distribution is unlimited
TB 10-4500-200-13, 30 March 1971 is changed as follows:
1.
Title changed as shown above.
2.
Remove and insert pages as indicated below. New or changed text material is indicated by a vertical bar
in the margin. An illustration change is indicated by a miniature pointing hand.
Remove pages
Insert pages
1 and 2
1 and 2
3.
Retain this sheet in front of manual for reference purposes.
By Order of the Secretary of the Army:
GORDON R. SULLIVAN
General, United States Army
Official:
Chief of Staff
MILTON H. HAMILTON
Administrative Assistant to the
Secretary of the Army
02882
DISTRIBUTION:
To be distributed in accordance with DA Form 12-25-E, block 5981, requirements for TB 10-4500-200-13.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business