|
|
TB 10-4500-200-13
C1
CHANGE
HEADQUARTERS
DEPARTMENT OF THE ARMY
NO. 1
WASHINGTON, D.C., 9 NOVEMBER 1992
Technical Bulletin
ASSEMBLY AND FABRICATION PROCEDURES
FOR ACCESSORIES REQUIRED TO ADAPT A
55-GALLON DRUM TO A FUEL SUPPLY TANK
USED WITH HEATER, SPACE, RADIANT TYPE,
PORTABLE, (LIQUID FUEL)
Approved for public release; Distribution is unlimited
TB 10-4500-200-13, 30 March 1971 is changed as follows:
1.
Title changed as shown above.
2.
Remove and insert pages as indicated below. New or changed text material is indicated by a vertical bar
in the margin. An illustration change is indicated by a miniature pointing hand.
Remove pages
Insert pages
1 and 2
3.
Retain this sheet in front of manual for reference purposes.
By Order of the Secretary of the Army:
GORDON R. SULLIVAN
General, United States Army
Official:
Chief of Staff
MILTON H. HAMILTON
Administrative Assistant to the
Secretary of the Army
02882
DISTRIBUTION:
To be distributed in accordance with DA Form 12-25-E, block 5981, requirements for TB 10-4500-200-13.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |