Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CABINET DOOR MAINTENANCE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   9-2330-272-14 5-9. CABINET    DOOR    MAINTENANCE. This  Task  Covers: a. Removal Repair b. Cleaning and Inspection d. Installation c. Initial Setup: Equipment  Conditions: Materials/Parts: Tank purged (para 4-64). Dry cleaning solvent (Item 16, Appendix E) Cabinet door hinges removed (para 4-61). Ten locknuts Tools/Test Equipment: General mechanic’s tool kit Field automotive shop set Welder’s tool kit References: TM  9-237 Personnel Required:  Two NOTE Cabinet doors are replaced the same way on all models except quantity of screws and locknuts may vary. M131A5 is Illustrated. 5-21

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business