Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: DRAINING TANK
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  9-2330-272-14 4-64.   PURGING   TANK   (Con’t). b.   DRAINING   TANK WARNING l  Do  NOT  perform  draining  operations  in  an  electrical  storm  or  if  a  storm  is threatening. Keep open flames or other sources of ignition, such as welding and cutting torches and ordinary electrical equipment, away from area where draining operation is in progress. Sufficient fire extinguishers MUST represent and manned. Failure to follow this warning will result in serious injury or death to personnel. .  Connect  bonding  and  grounding  connection  before  beginning  draining  operations. Maintain bonding and grounding connection until after all draining is completed. Connections  must  be  made  to  clean,  unpainted  surfaces.  An  unbended  and ungrounded or improperly bonded and grounded semitrailer could produce a spark. The resulting explosion will cause serious injury or death to personnel. l Personnel engaged in draining operations must not wear wool, nylon, silk, rayon, or other clothing that generates static electricity. Wear clean cotton clothing with no metal zippers, Remove all contents from pockets. Wear rubber boots and gloves to keep fuel off skin. Use cotton cloths for cleaning purposes. Before climbing onto semitrailer, grasp static ground wire to discharge all static from body. . Give IMMEDIATE medical attention to personnel exposed to hydrocarbon or toxic vapors.   Signs   of   distress   are   weakness,   nausea,   coughing   or   intoxication, nosebleed  or  cramps,  or  other  unusual  symptoms.  Qualified  personnel  able  to administer artificial respiration and simple first aid must be present. 1.     Park semitrailer 100 ft (30.5 m) from any building, source of ignition, or sewer system Close all windows and doors of nearby buildings to prevent flow of vapors into areas where flame and other sources of ignition may exist. 2.      Uncouple  smeitrailer  form  towing  vehicle  (para  2-12) 3.      Connect  bonding  and  grounding  connections  (para  2-13). 4.    Place sufficient fire extinguishers 50 ft (15.25m) upwind and attend with qualified personnel. 5.    Place drain pans under all drain points. Ground drain pans to tank and to tank's common ground. Grounding conections  shall  be  made  to  clean,  unpainted  surfaces. CAUTION Meters should be air dried thoroughly to eliminate rusting of internal moving park. 6.  Completely drain tank interior, all piping, and pump. On M131A4C and M131A5C, completely drain meter and filter-separator.  Remove  all  accessory  items,  such  as  gages  and  floats,  which  might  entrap  fuel.  Drain  the equipment  that  has  been  removed.  Wiupe  dry  all  connections. 7. Wipe dry all spilled fuel. Wash, dry, and store any cloths or mops used, or dispose of them in accordance with local    policy. 4-131

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business