| |
TM 5-5430-219-13
NOTE
Equipment operation is available with minor leakages (Class I or II). Of course, you must
consider the fluid capacity in the itern/system being checked/inspected. When in doubt,
notify your supervisor.
3-8.5 The procedure column of your PMCS table tells you how to do the required checks and
services. Carefully follow these instructions. If you do not have tools, or if the procedure tells you to,
have intermediate direct support maintenance do the work.
3-8.6 If your equipment does not perform as required, refer to Section V, Troubleshooting, for
possible problems. Report all malfunctions or failures on DA Form 2404, or refer to DA Pam 738-750.
Table 3-1. Unit Preventive Maintenance Checks and Services
B - Before
D - During
A - After
S - Semiannually
Change 2 3-3
|