Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATING PROCEDURE CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  5-5430-218-13 2 - 5 . OPERATING PROCEDURE -   (Continued). (6)   Dry   tank   by   purging   with   air   pressure. Explosion-proof   blower   or   compressed   air   source   should   be   used to   purge   tank. The   compressed   air   supply   should   not   exceed   50 PSI   (3.4   Atmospheres). (a)   Install   dust   cap   on   vent   and   pipe   assembly   flange   adapter. (b)   Insert   air   hose   through   filler/discharge   assembly   opening. ( c )    P l a c e    r a g s    ( A p p e n d i x    F, I t e m    2 )    a r o u n d    h o s e    a t    f i t t i n g    to prevent   air   from   escaping. (d)   Inflate   tank   until   tank   is   3   feet   (0.9   m)   high. (e)   Remove   dust   cap   from   vent   and   pipe   assembly   flange   adapter. Allow   air   to   vent   for   30   minutes. (f)   Turn   off   air   supply,   and   remove   air   hose   and   rags. (7)   Install   dust   cap   on   filler/discharge   assembly   flange   adapter (8)   Disconnect   drain   hose   and   drain   valve   from   drain   assembly. (9)   Install   dust   cap   on   vent   and   pipe   assembly   flange   adapter. NOTE The   drain   assembly   plug   must   be   removed   to   allow   the   tank   to vent   freely   during   folding. If  tank  is  destined  for  long  time  storage  apply  talcum  powder (Addendix   F,   Item   3). (10)   Brush   debris   from   top   of   tank. (11)   Fold   right   side   of   tank   over   top   about   1/3   (See   Figure   2-5). (12)   Fold   left   side   over   top. (13)   Starting   at   up   slope   end,   roll   tank   toward   down   slope   (See   Figure 2-4)  . (14)   After   tank   is   vented,   install   drain   plug. (15)   Secure   rolled   tank   for   ease   of   handling. 2-18 NOTE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business