Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE- (CONTINUED)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  5-5430-218-13 2 - 4. ASSEMBLY  AND  PREPARATION  FOR  USE  -    (Continued). (7)   Place   vent   and   pipe   assembly   on   tank   vent   fitting   coupling.   Lock a s s e m b l y    i n    p l a c e    b y    c l o s i n g    b o t h    d i s c o n n e c t    c a m    l e v e r    a r m s    at same  time. (8)   Remove   dust   cap   from   filler/discharge   coupling. ( 9 )    P l a c e    9 0° e l b o w    o n    t a n k    f i l l e r / d i s c h a r g e    c o u p l i n g. Ensure   male opening   is   pointed   toward   nearest   tank   edge. Lock   90°   elbow   in p l a c e    b y    c l o s i n g    b o t h    q u i c k - d i s c o n n e c t    c a m    l e v e r    a r m s    a t    s a me time. ( 1 0 )    C o n n e c t    4    t o    3    i n c h    r e d u c e r    t o    9 0 °    e l b o w .    L o c k    c o n n e c t i o n    by closing   both   quick-disconnect   cam   lever   arms   at   same   time. ( 1 1 )    C o n n e c t    3    i n c h    h o s e    t o    r e d u c e r. Lock   connection   by   closing   both quick-disconnect   cam   lever   arms   at   same   time. (12) Connect 3 inch gate valve to 3 inch hose. Lock connection by closing   both   quick-disconnect   cam   lever   arms   at   same   time. ( 1 3 )    C h e c k    t h a t    3    i n c h    g a t e    v a l v e    i s    c l o s e d .    V a l v e    h a n d l e    m u s t    b e turned   fully   clockwise. (14)   Remove   crate   from   site. NOTE The   tank   is   now   fully   assembled.   Make   certain   that   a   dust cap   covers   the   unused   valve   coupling. e . Berm   Construction   (See   Figure   2-7). The   site   must   be   bermed   to   contain the   flow   of   fuel   in   case   of   tank   rupture   or   leakage.   The   tank   may   be f i l l e d    b e f o r e    i t    i s    b e r m e d    i f    t h e    s i t u a t i o n    d i c t a t e s .    H o w e v e r ,    n o r m al p r o c e d u r e s    a r e    t o    b e r m    t h e    s i t e    a r e a    b e f o r e    t h e    t a n k    i s    f i l l e d .    An erected   berm   (Figure   2-8)   should   have   the   following   characteristics: (1)   At   least   a   5   foot   (1.5   m)   working   area   between   the   tank   and   the berm  walls. ( 2 )    W a l l    h e i g h t    s h o u l d    b e    1 . 5    f e e t    ( 4 5 . 7    c m ) .    T h i s    w i l l    p r o v i d e    an internal   volume   of   at   least   937.5   cubic   feet   (26.61   cubic   meters) or   7,000   gallons. (3)   Walls   should   be   protected   against   erosion   with   a   covering   of   sod or  stone ( 4 )    A    d r a in low   end is  normal pipe   and   valve   should   be   placed   through   the   berm   at   the of   the   site   to   remove   accumulated   rainwater. This   drain ly  closed  and  can  be  opened  as  needed. 2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business