Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Testing
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4930-235-13&P f.  Testing. WARNING High pressures used during testing may cause rupturing or bursting of faulty hoses and result in serious injury.  To prevent injury, cover hoses with a suitable safety shield.  Be sure pressures are bled off before exposing or touching hoses. CAUTION Failure  of  any  test  is  cause  for  rejection  of  nozzle  assembly  until  fault  is  corrected.    Refer  to Troubleshooting, Table 5-1, to determine probable cause of failure. If strainer housing or coupling threads leak, tighten one thread.  Do not over tighten.  Failure to comply can result in damage to parts. NOTE For  testing,  unisex  coupling  must  be  replaced  with  cam-lock  assembly  MS27026-1  1  (FSCM 96906) complete with gasket MS27030-6 (FSCM 96906).  When testing is completed, reassemble nozzle using instructions in chapter 4. (1)  After repair and prior to release for aircraft refueling, test nozzle in an operating, pressurizing  refueling system to ensure no leakage occurs. All data on pages 5-22.1/(5-22.2 blank and 5-23, including Figure 5-10, have been deleted. Change 2 5-22

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business