Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACE ENGINE ASSEMBLY (Continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-306-24 36.  REPLACE ENGINE ASSEMBLY (Continued) 4. Install dial gauge No.100400 (1).  Pre-tension gauge to midscale (approximately 5.0 mm) or adjusting device No 100640 (2).  Secure in place using knurled nut (3). 5. Slowly rotate V-belt pulley clockwise until piston starts to push valve up.  Gauge pointer (1) will move clockwise.  Continue to rotate V-bell pulley until gauge pointer stops.  This is Top Dead Center (TDC). 6. Stop rotation at TDC, and mark V-belt pulley at this location.  Location should align with roll pin in front cover above pulley.  Remove adjusting device No 100640.  Repeat steps 2 through 6, if necessary. All data on pages 3-28 and 3-29 deleted. Change 1  3-27

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business