Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACE/REPAIR PUMP ASSEMBLY (Continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-306-24 3-4.  REPLACE/REPAIR PUMP ASSEMBLY (Continued) WARNING Death  or  serious  injury  could  occur  if  unauthorized  or  unnecessary  personnel are in the hoisting area.  Permit only personnel actually engaged in the hoisting operation  to  be  near  the  unit  and  hoisting  equipment.    All  instructions  for  the hoisting operations must come from one authorized person. Injury   to   personnel   or   damage   to   equipment   could   occur   from   improper hoisting.      Hoist   the   load   slowly   to   avoid   tearing   out   lifting   bail   assembly, slipping slings, or load shift.  Do not jerk the load or swing it from side-to-side when  hoisting.    This  places  additional  stress  on  hoisting  components  which can  cause  failure  and  loss  of  load.    Be  sure  hoisting  equipment  is  on  solid footing and is suitable for the size of the load.  Watch boom angle and overhead clearance when hoisting. 6. Position a suitable lifting device equipped with a spreader bar and slings over pump assembly.  Attach slings around assembly and put tension on slings.  Make sure pump assembly is properly supported.  Spread slings on spreader bar so that slings hang vertically when attached to assembly. 7. Lift and remove pump assembly from blocks on work platform.  Lower carefully so that bearing housing assembly alines with flywheel housing.  Aline holes in coupling collar with drive pins on flywheel, and pump body mounting holes with  holes  in  pump  mount  beam.    When  these  holes  and  pins  are  alined,  slide  pump  and  bearing  housing  assembly toward engine so that flexible coupling mates and engages properly. NOTE Alinement of the flexible coupling and flywheel may be checked and corrected by viewing through bearing housing. 3-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business