Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACE/REPAIR PUMP ASSEMBLY (Continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-306-24 3-4.  REPLACE/REPAIR PUMP ASSEMBLY (Continued) WARNING Death or serious injury could occur if unauthorized or unnecessary personnel are in the hoisting area.  Permit only personnel actually engaged in the hoisting operation to   be   near   the   unit   and   hoisting   equipment.      All   instructions   for   the   hoisting operations must come from one authorized person. Injury  to  personnel  or  damage  to  equipment  could  occur  from  improper  hoisting. Hoist  the  load  slowly  to  avoid  tearing  out  lifting  bail  assembly,  slipping  slings,  or load  shift.    Do  not  jerk  the  load  or  swing  it  from  side-to-side  when  hoisting.    This places additional stress on hoisting components which can cause failure and loss of load.  Be sure hoisting equipment is on solid footing and is suitable for the size of the load.  Watch boom angle and overhead clearance when hoisting. 2.  Position a suitable lifting device equipped with a spreader bar and slings over pump assembly (2).  Attach slings (3) around  assembly  and  put  tension  on  slings.    Make  sure  pump  assembly  is  properly  supported.    Spread  slings  on spreader bar so that slings hang vertically when attached to assembly. 3.  Remove screws (4), nuts (5), lockwashers (6), flat washers (7), and shims (8). NOTE Flywheel   guards   are   mounted   to   bearing   housing   with   screws   that   mount   bearing housing to flywheel housing. 4.  Remove screws and lockwashers (9). 5.  Remove flywheel guards (10). 6.  Lift and remove pump assembly (2) from skid and engine assembly, and lower onto blocks on a stable, level work platform. 3-8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business