Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: lNSPECT/REPLACE CYLINDER HEAD AND VALVE ASSEMBLY (Continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   5-4320-304-14 TM   08922A-14/1 5-10.   lNSPECT/REPLACE   CYLINDER   HEAD   AND   VALVE   ASSEMBLY   (Continued) 2 3 4 5 i.    Subtract  reading  on  dial  gage  that  was  recorded  from  the  required  clearance  of  0.0217/0.0256 inch  (0.55/0.65  mm).  This  difference  is  the  thickness  of  the  gasket  needed  for  proper  cylinder head  clearance. NOTE Gaskets come in various thicknesses. If you have a choice between two gaskets, it is best to use the thickest one. j.  Remove  dial  gage  612  087  00  with  measuring  device  603  114  00,  and  retaining  bracket 612 752 00. Adjust  complete  push  rod  (1)  so  dimension  A  equals  5.8189/5.8268 inches  (147.8/148.0  mm).  This  adjustment  is  required  for  proper engagement  of  complete  pushrod  with  pinion  on  decompression shaft. Install  preformed  packings  (4),  shims  (5),  pressure springs  (6),  and  protection  tubes  (3). Install  complete  pushrod  (2)  closest  to  injection pump  side  of  engine. Install   pushrod   (1). 5-30

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business