Click here to make tpub.com your Home Page

Page Title: APPENDIX B. BASIC ISSUE ITEMS LIST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

APPENDIX B
BASIC ISSUE ITEMS LIST
Section I. INTRODUCTION
B-1. Scope
X
Applied to parts and assemblies which are not
This appendix lists items which accompany the John
procured or stocked, the mortality of which
Reiner Centrifugal Pump-Model GP 110-5, or are required
is normally below that of the applicable end
for installation, operation, or operator's maintenance.
item, and the failure of which should result
in  retirement of the end item from the
B-2. General
supply system.
This Basic Issue Item List is divided into the following
X1
Applied to repair parts which are not procured
sections:
or stocked, the requirement for which will
a. Basic Issue Items-Section II.  This section is a
be  supplied by use of the next higher
listing of accessories, repair parts, tools, and publications
assembly or components.
required for operator's maintenance and operation,
X2
Applied to repair parts which are not stocked.
initially issued with, or authorized for the Centrifugal
The  indicated  maintenance  category
Pump Unit.
requiring such repair parts will attempt to
b. Maintenance and Operating Supplies Section III.
obtain them through cannibalization; if not
This section is a listing of maintenance and operating
obtainable through  cannibalization, such
supplies required for initial operation.
repair parts will be requisitioned with
supporting  justification  through  normal
supply channels.
B-3. Explanation of Columns
C
Applied to repair parts authorized for local
procurements. If not obtainable from local
The following provides an. explanation of columns in the
procurement, such repair parts will be
tabular list of Basic Issue Items, Section II:
requisitioned  through  normal  supply
channels with a supporting statement of
a. Source, Maintenance, and Recoverability Codes
non-availability from local procurement.
(SMR), Column (1):
G
Applied to Major assemblies that are procured
(1) Source Code indicates the selection status
with  PEMA  (Procurement  Equipment
and source for the listed item. Source codes are:
Missile Army) funds for initial issue only to
be used as exchange assemblies at DSU
and GSU lever or returned to depot supply
Code
Explanation
level.
P
Applied to repair parts which are stocked in or
Note
supplied from GSA/DSA Army supply system,
Source  code  is  not  shown  on
and  authorized  for  use  at  indicated
common hardware items known to
maintenance categories.
be readily available in Army supply
M
Applied to repair parts which are not procured
channels
and
through
local
or stocked, but are to be manufactured at
procurement.
indicated maintenance categories.
A
Applied to assemblies which are not procured,
or stocked as such, but made up of two or
(2) Maintenance Code indicates the lowest
more  units, each of which carry individual
category of maintenance authorized to install the listed
stock numbers and descriptions and are
item. The maintenance level code is:
procured and stocked and can be assembled
by units at indicated maintenance categories.
B1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business