Click here to make tpub.com your Home Page

Page Title: CHAPTER 4. DIRECT AND GENERAL SUPPORT AND DEPOT MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

CHAPTER 4
DIRECT AND GENERAL SUPPORT AND DEPOT MAINTENANCE INSTRUCTIONS
Section I. GENERAL
4-1. Scope
For record and report forms applicable to direct and
general support and depot maintenance, refer to TM
These instructions are published for the use of direct
38750.
and general support and depot maintenance personnel
maintaining the Reiner Model GP 110-5 Centrifugal
Note
Pump. They provide information on the maintenance of
Applicable forms, excluding Standard
the equipment which is beyond the scope of tools,
Form 46 which is carried by the
equipment, personnel or supplies normally available to
operator, shall be kept in a canvas bag
using organizations.
mounted on equipment.
4-2. Record and Report Forms
Section II. DESCRIPTION AND TABULATED DATA
d. Pump Repair and Replacement Standards. The
4-3. Description
following data lists specifications and adjustments of
rotating element assembly components.
For a complete description of the John Reiner Model GP
(1) Concentricity between bore of bottom of
110-5 Centrifugal Pump refer to paragraph 1-3.
the stuffing box and pump shaft, total indicated runout
_0.010 in. max. (maximum)
4-4. Tabulated Data
(2) Face of stuffing box bottom squared to pump shaft,
total indicated runout ........................... 0.005 in. max.
a. General.
This paragraph contains all the
(3) Bearing end cover to splash collar clearance at rear
overhaul data pertinent to direct and general support
end with rotating element assembly moved maximum
and depot maintenance personnel.  A wiring diagram
distance toward rear of pump ...................... 0.0312 in.
(fig. 1-5) will be found in chapter 1.
(4) Bearing end cover to splash collar clearance at front
b. Tabulated Data.
end, with rotating element assembly moved maximum
(1) General. Refer to paragraph 1-4.
distance towards front of pump .................... 0.0312 in.
(2) Engine. Refer to paragraph 1-4.
(5) Nominal clearance between bearing end covers and
(3) Pump assembly. Refer to paragraph 1-4.
splash collars, with rotating element at center position in
(4) Engine accessories. Refer to paragraph
pump -0.0625 in.
(6) Mechanical seal, drive collar-to-gland clearance,
c. Engine Repair and Replacement Standards.
front of pump ................................ ................ 0.125 in.
Table  4-1  lists  manufacturer's  sizes,  tolerances,
(7)  Mechanical seal, drive collar-to-gland clearance,
clearances, and the maximum allowable wear and
rear of pump ................................ ................. 0.125 in.
clearance.
4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business