Click here to make tpub.com your Home Page

Page Title: Section II. MOVEMENT TO NEW WORKSITE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Figure 2-5. Y-Fitting connection for parallel operation.
Section II. MOVEMENT TO NEW WORKSITE
2-6. Dismantling for Movement
(7) Disconnect
the
battery
terminal
connectors, and apply protective tape to the connectors
a. Preparation for Movement.
after removal.
(1) Disconnect suction and discharge lines.
(8) Close and secure all doors and panels.
Remove auxiliary fuel line if connected.  Install dust
plugs and caps to suction and discharge fittings.
b. Short Move. The pump can be moved short
distances on its skid, after the above steps are
(2) Disconnect ground cable.
performed, by using the towing eye on either end of the
(3) Make sure items on basic issue items list
skid.
are provided.
c. Long Move.  After performing the steps in a.
(4) Disconnect exhaust pipe extension, if any.
above, the unit should be lifted onto a carrier by means
of the lifting bail (fig. 1-2). Block and tie unit securely to
(5) Drain fuel tank and pump casing if unit is
the bed of the carrier to prevent shifting during transport.
to be moved by common carrier.
(6) Remove the crossover pipe or Y-fitting, as
applicable.
2-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business