Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Defuel Mode - 4-Inch Ball Valve on Bottom Loading Points
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-241-13 2-18.  OPERATING PROCEDURES - CONT. (3) Defuel Mode - 4-Inch Ball Valve on Bottom Loading Points.  Refer to figure 2-33. WARNING Do not touch surfaces with bare skin.  Bare skin will freeze to metal surfaces in subzero temperatures.  Always wear arctic mittens when handling components. NOTES Handle on tank 4-inch ball valves may be opened to allow fuel from one or two supply tankers at the same time.  Open handles as needed to support your mission. Handwheels  on  fueling  manifolds  may  be  opened  to  allow  fuel flow to fill one, two or three fuel tanks at the same time.  Open valves as needed to support your mission requirements. This  procedures  describes  filling  three  tanks  at  the  same  time from one supply tanker. (a)   Connect 4-inch ball valve (1) to supply source. (b)   Turn handle (2) to open position on ball valve. (c)   Turn handwheel (3) to open position on fueling manifold. (d)   Ensure gate valves (4 thru 10) are closed. (e)   Turn handwheel (11) to open position on fueling manifold. (f) Ensure gate valves (12 and 13) are closed. (g)   Turn handwheels (14 and 15) to open position on fueling manifold. (h)   Ensure gate valve (16) is closed. (i) Turn handwheel (17) to open position on fueling manifold. (j) Ensure gate valve (18) is closed. (k)   Turn handwheel (19) to open position on fueling manifold. (l) Ensure gate valve (20) is closed. (m) Turn handwheels (21 thru 26) to open position on valve section. (n)   Ensure gate valve (27) is closed. (o)   Start and operate secondary 600 GPM pump (28) until operation is complete. (p)   Shut down secondary 600 GPM pump (28). 2-78