Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Inspection
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM10-4930-239- 12&P c.   Inspection. (1) Inspect all metal parts for cracks, corrosion, or broken fittings. (2) Examine all coupling half gaskets for cracks, tears, or nicks. (3) Check gate valve assembly for crack surfaces, bent handwheel and for smooth handwheel operation. d.   Assembly. (1) Install split ring (13) onto coupling half (3). (2) Install two new gaskets (11), coupling half (6), coupling half (3), sixteen nuts (10), sixteen new lock washers (9), sixteen flat washers (8), and sixteen screws (7) onto gate valve (12). (3) Install gasket (5) and quick disconnect plug (4) onto coupling half (6). (4) Install gasket (2) and quick disconnect cap (1) onto coupling half (3). ' 4-22/(4-23 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business