Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   10-4320-343-14 Open   vent   valve   (figure   2-5, 1)   and   ensure   that   all   suction   valves   (2)   and discharge   valves   (3)   are   closed. DO  not   smoke   or   use   open   flames   around   fuel. Ensure   container   is used   to   catch   fuel   and   fuel   is   disposed   of   properly. Failure   to obey   this   warning   may   result   in   personnel   injury   or   death. Do   not   operate   pump   before   replacing   priming   port   cap. Failure   to replace   priming   port   cap   and   locking   securely   may   result   in   personal i n j u r y. Check   pump   fuel   level   by   carefully   opening   camlock   levers   on   priming   port cap   (4)   and   raising   port   cap   slightly   to   see   if   fuel   is   discharged   from priming   port. If   fuel   is   discharged,   quickly   install   priming   port   cap   and place   camlock   levers   in   locked   position. If   fuel   is   not   discharged,   remove port   cap   and   add   clean   fuel   of   the   type   to   be   pumped, until   fuel   level   reaches the   top   of   the   priming   port. Install   priming   port   cap   (4)   and   place   camlock   levers   in   locked   position. Push   and   raise   throttle   control   (5)   from   detent   latch,   releasing   it   to   the 2.4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST. Perform  all   BEFORE   PMCS  prior  to  operating  equipment. 2.5 OPERATING PROCEDURES. The   technical   manual   (TM)   reference   on   instruction   plate   should   refer   to TM   10-4320-343-14 instead of TM 5-4320-226-14. Operating   procedures   for   the   350   GPM   Pumping   Assembly   are   provided   in paragraphs   2.5.1   through   2.5.2. In   addition,   an   instruction   plate   is   provided  o n the   lid   of   the   Control   Panel. 2.5.1 Starting and Shutdown for Non-regulated Pumps. Starting   and   shutdown   procedures   for nonregulated  350  GPM  Pumping  Assemblies  are  provided  in  the  following  paragraphs: 2.5.1.1 Starting for Non-regulated Models. Perform   the   following   procedures equipment: To   prevent   rolling   or   sliding,    do   not   work   on   equipment   that not   securely   stabilized. Ensure   both   wheels   are   secure. Failure   to   obey   this   warning   may   result   in   serious   personal i n j u r y . to   start   the i s a. b. c . d. e . f . i d l e    p o s i t i o n. When   outside   temperature   is   below   +10°   F   (-12°   C)   refer   to operation   of   cold   start   system. Open   Control   Panel   as   follows: (1)   Turn   the   two   fasteners   on   Control   Panel   counterclockwise r e l e a s e. paragraph   2-8   for until    fasteners (2)   Raise   Control   Panel   cover   until   retaining   holes   in   two   brackets   mounted   on top   of   Control   Panel   align   with   retaining   hole   in   bracket   mounted   on   cover. 2-17 WARNING

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business